| Year | Air | Water | Land | Total |
|---|---|---|---|---|
| 2022 | 110 lbs | 0 lbs | 0 lbs | 110 lbs |
| 2023 | 91 lbs | 14 lbs | 0 lbs | 105 lbs |
| 2024 | 105 lbs | 14 lbs | 0 lbs | 119 lbs |
Latest 2024 TRI data shows air as the largest reported pathway for this chemical at the facility.